Spring Ventilation Checklist | ||
Exterior | All soffits open and swept clean | |
Curtains free and insulation removed | ||
Emergency curtain drops tested and functioning | ||
All fans plugged in, uncovered, and in and in good state of repair | ||
Generator started and checked under load | ||
Internal | Insulation removed from curtains | |
Fan covers removed | ||
Emergency dial out settings verified correct | ||
Generator started and checked under load | ||
Ceiling inlets recalibrated and consistent and curtains ends sealed | ||
All fans are cleaned, working and shudders in good repair | ||
Temperature overrides set at 90 degrees | ||
High-temperature alarms set at 90 degrees | ||
All curtains fully dropped and working properly | ||
Controller | Temperature curve checked | |
All fans functioning | ||
Curve / Bandwidths adjusted if appropriate | ||
Tunnel settings checked and verified operational |
1 Comment